Please complete the below online form and attach any relevant documents that will help us in developing a more reliable report (e.g., site map, prior reserve study, budgeting documents, pictures, etc.). This Boost Reserve Report will only be as reliable as the component list being supplied to us as we as we do not verify measurements, installation dates, last replacement dates or any Client supplied project costs for this level of service. Just as BYOB implies, we supply the platform and structure, but you bring the component data; together we can create something that can be beneficial for your reserve budgeting needs at a price that does not break your budget.
This Boost-Your-Own-Budget (BYOB) option does not have the same level of Analyst independence (e.g., verification of an accurate component list) or Analyst component recommendations (e.g., timing projects together for cost efficiencies) by a reserve specialist. It is best for less complex reserve budgeting scenarios and has a 20-Component Limit. This option can be a cost-effective budgeting tool that is most suitable for those that have a higher comfort level and/or more experience with project costs and useful life expectancies for site and building components.
This report also includes a Boost Your Own Budget Excel Worksheet (link to screenshot to the right) for running "what if" scenarios.
VII. PAYMENT REQUIRED UPFRONT
The $450 payment is required upfront before we complete the Boost Reserve report. You can follow the Pay Now link to pay through PayPal, follow the ACH payment button to pay with a digital check online, call us at Toll Free: (877) DIY-BYOB "(877) 349-2962", or send a check to our corporate address, below. We will proceed with completion of the report after payment has been made.
PayPal Payment
ACH Payment
Corporate Address